The only choice for
perfect pipe installations


Facebook

twitter

YouTube

RSS

News

The latest news are to be found here.

22.11.2011
GRUNDORAM assisted Horizontal Directional Drilling in Saudi Arabia
Ramming machines are typically used to install steel pipes underneath traffic and waterways. In pipeline construction these machines are also applied to assist or rescue HDD bores. The Grundoram Taurus was recently used by Saudi Arabian company GBP for a so-called "pullback assist". The rammer's impact energy of 18.600 Nm assisted in installing a 48" steel pipe along the Aramco Manifa to Saphaniyah pipeline.
19.09.2011
Underground cabling in rock beneath railway line, motorway and main road

It was almost a year ago that the company Clemens Reuschenbach in Germany was involved with ground cabling measures for the connection service line from the villages Puderbach to Oberhonnefeld with two 20 kV cables and a glass fibre cable. The reason for the measure was the deconstruction of the 20 KV open line from SÜWAG Frankfurt, to make the power supply more secure.Now the time had arrived to close the gap over a total length of 375 m beneath the high-speed inter-city railway line from Frankfurt to Cologne, the A3 motorway and the L 265 main road close to the waste deposit site of the Neuwied district. The ambitious bore project was carried out by the company Clemens Reuschenbach, together with their sister company REVOR GmbH. 
 

21.07.2011
HDD bore through a steep slope

When travelling on a 400 m high bridge on a mountain known in German as "Sollstedter Hölle", which in English means “Sollstedt Hell”, TT marketing manager Günter Naujoks asked himself  whether this name was going to prove to be a good omen given the job in hand? The site was situated on the high plateau approximately 5 km from the nearest village.

07.04.2011
Grundoram Apollo used for large-scale gas pipeline construction project
The world’s largest steel pipe ramming machine, the GRUNDORAM “APOLLO” from TT was recently used by Dutch civil engineering company DALCAI for ramming 32 km of Ø 1220 mmsteel pipes applications as part of the large-scale “Noord - Zuid Project” in the Netherlands.
17.01.2011
Installation of a 125 mm PE pipe with Grundopit
On behalf of Scottish & Southern Energy contractor Option Utility Services installled a 125 mm PE pipe over 21 m length using the Grundopit mini bore rig. A total of 3 different bores, which had to cross several existing mains, were made. The new pipe is used a carry an electric cable. 
22.10.2010
HDD application in the world famous Château Margaux vineyard
Chateau Margaux, situated 25 km to the north of Bordeaux has become famous for its wine, which is among the best in the world. The vineyards covering 265 hectares even include both of the Margaux islands and Verte in the estuary of the river Gironde. To connect the Castle to the power supply network, the HDD technique was applied.
26.07.2010
House connections installed with minimal invasion using the trenchless Keyhole Technology
The increasing sensivity of the residents affected, impairment of local infrastructure and mobility restrictions caused by installation projects using open-trench method are the driving force behind furher developments in trenchless installation technology. The sophisticated Keyhole technology for the trenchless installtion of service lines reduces surface disruption to a minimum.
05.05.2010
Long HDD bore for the Garzweiler mines
Once again the bore team around Helmut Schürmann and Michael Foltin from the bore company REVOR were confronted with what was not an everyday task.  Foltin is a casual character, well known for his phlegmatic calmness, but also for his knowledge and experience.  He has been with REVOR since 2005 and very experienced with the GRUNDODRILL 15 N...
18.03.2010
HDD application to let 'green' power flow underneath the Rhine
From 2009 until 2012 work will be carried out on the Rhine power plant Iffezheim (RKI) to be extended with a 5th turbine. Directly on the Rhine crossing of the B 500 to France, the largest Hydropower plant in Germany and one of the largest in Europe is emerging. 
Video
12.01.2010
Trenchless installation of a new house connection sewer

The wastewater connection of a family home in Wildeshausen/Germany indicated some fractional damages, causing it to block regularly and then constantly needing to be rinsed free. Due to this reason a decision was made to install a new sewer.

27.08.2009
Rivercrossing in Oxfordshire using the Grundodrill
Options Utility Services Ltd recently carried out under crossing of the river Cherwell using their recently accquired Grundodrill HDD rig.
20.08.2009
EON connects the island Helgoland to the power network
Up to now power was supplied to the island of Helgoland in the North Sea via Diesel power engines which were starting to age. The 7 million litres of Diesel consumed annually are omitted in the future and also 17.500 tons of CO². Now a 20 million Euro project has been set up to connect Helgoland to the European power supply network. For this reason a 51,7 km long pipeline was installed within only 12 days from the land-based city of St. Peter Ording to Helgoland.
Video
23.07.2009
Constructing an underpass below a box culvert using Grundoram
Construction company Dragages from Singapore was contracted to shore and construct an underpass below a huge box culvert and parallel to a technical tunnel in Singapore Marina Bay using the Grundoram Gigant steel pipe ramming machine. The size of the underpass is 12 m in width, 7 m in height and 12 m in length.
29.06.2009
Grundodrill 15 XP installs district heating pipe
The castle Laer in Meschede in Germany, which was the ancestral seat of the Duke of Westphalia Fuerstenberg, is to be converted to district heating during the next heating period. The oil heater will then be switched off, but not completely dismantled. The district heating is to be supplied by a wood-fired heating station providing a heating power of 600 kW.
21.04.2009
Prime Drilling rig used for high-standard HDD project
Mears Group Inc. recently installed a 10-inch (254 mm) steel pipeline in the city limits of Billings/Montana (USA) using an HDD rig built Prime Drilling and specially custom designed for Mears. The 1,635-foot (500 m)line replaced the existing product line to make way for a road expansion project at Airport Road.
03.03.2009
House connection with Grundobore 200S auger boring system
On a property next to the TT premises in Lennestadt´/Germany a house connections had to be completely re-installled. The TT crew carried out the complete replacement of the pipeline with a new one using its Grundobore Type 200 S pilot auger boring system.
25.02.2009
Spectacular undersea HDD recovery with Grundoram
TT-UK were contacted by the Middle East specialist HDD Contractor Digital Connection Co Ltd of Al-Khobar, Kingdom of Saudi Arabia (KSA). They sought technical advice and assistance in the recovery of a 42” hole-opener that had become stuck along with the 3 km drill string beneath the seabed during a pre-ream pass on the second of two under sea pipeline crossings. Grundoram Taurus came to the rescue on the worlds longest undersea HDD recovery operation...
24.02.2009
GRUNDOMAT sets new Record in South Africa
South African contractor Jacked Pipelines have done 26,312.8m of 63mm Grundomat moling and 1,304.5m of 110mm moling within the last two years - a new record!
19.12.2008
Grundomat success in Oman
Due to the increased demand for Broadband Telecommunications and Internet access the Oman Fiber Optic Company has been challenged with the task of laying a fibre optic cable network into the major cities of Muscat and Sohar and the entire Batinah Region...
15.10.2008
Underwater bore - 400 m out to the Baltic sea
In the german holiday resort Kühlungsborn,  the Baltic sea supplies the mineral water for a public wellness swimming pool at the beach hotel Morada , which is currently being built. Suction and outlet pipes ND 160 made of PE provide access and discharge via the sea.
26.08.2008
192 m district heating pipes installed with HDD system
In the lower Saxon region Hessisch Oldendorf in Germany - a town with approximately 20.000 inhabitants on the River Weser - the company E.ON Westfalen Weser Energie-Service GmbH, Kirchlengern, is building a biogas plant. The plant will produce 11 million kilowatt hours of power annually. 13.000 t of corn and 3.000 tons of crop, as well as liquid manure, loppings and kitchen waste are required each year.
02.07.2008
Grundopit 40/60 working for County Council in Ireland
Shareridge Limited, a utility contractor based in Waterford contacted TT Ireland to carry out a demonstration using a Grundopit 40/60 mini-directional boring system for the project they are currently employed by Waterford County Council. The demonstration consisted of boring beneath terrace properties in the Pearse Park and German Road area of Waterford to replace the existing lead water services with a new 20mm PE water pipe
18.03.2008
Spectaclur cable plow application
Installation of a new drinking water pipeline from an elevated tank to supply a youth hostel and a lodge near the ski lift in the winter sport region of Schmallenberg in western Germany.
17.03.2008
Challenging Grundodrill 25N job in Germany
Huge pipes underneath narrow streets - The cross-town link in the small town of Mülhausen in Germay recently was the stage for a spectactular HDD application where the company BLK installed a drainage pipe ND 700.
22.01.2008
Curved bore expanded to 570 mm over 75 m

Even carrying out relatively short HDD bores can be a pretentious challenge, as was the case in Issenbütten near Braunschweig in Germany. The contracor had to install a 400 mm protection pipe  for a 315 mm drinking water pipeline in a residential area over a length of only 75 m in a sharp S-curve using the HDD method.

14.01.2008
Rock drilling below motorway
Contractor NWR carried out a challenging bore task with Grundodrill 15N. A deep level bore had to be established below the A45 motorway through an exisiting dip. The new drinking water pipe (HD-PE OD 125 mm) is supposed to connect the City of Münzenberg with the suburb Trais.
11.01.2008
Tricky HDD bore under a motorway near Cologne
The pre-construction works for the expansion of the A1 motorway near Cologne included two parallel bores (1 x OD 450, 2 x OD 160 as a bundle) over 138 m length below the motorway using the Grundodrill 15N.
10.01.2008
Pipe installation underneath lake Müritz/Germany
The current capacity of the power supply network had to be increased to ensure the supply for an expansion of an industrial park in Malchow near the lake Müritz the province of Mecklenburg-Western Pomerania. A pipeline below lake Müritz with a length of 350 meters which had already installed in 1998 using the HDD method was not able to cover the current requirements sufficiently in peak times. Thus additional power cables with cross-section of 150 mm² each had to be installed in three 160 mm HDPE protection pipes.
19.12.2007
Grundodrill 15N installs 450mm PEpipe parallel to main road
The drinking water supply network in the comminity of Steinhagen/Germany had to be extended. The exisiting transport pipe OD 300 was to be closed down, but so that it could be re-activated at any time. The new PE drinking water pipeline OD 450 was to be installed in 3 con-struction sections over a length of 3,6 km, mostly parallel to a 30 year old grey cast iron pipe.
03.12.2007
Challenging HDD rock bore in Germany
German contractor Meyer & Meyer had to fulfill a special task: the installation of a pipe bundle consisting of two protection pipes HDPE Ø 160 mm, a HDPE gas pipe Ø 110 mm and a HDPE drining water pipe Ø 160 mm over a distance of 90 m through the rocky soil underneath a little river.